    Dear Cllr Richard Olszewski,

    I am a resident of the Alexandra Road Estate. I urge you to intervene in Camden’s heating replacement proposal. Without a full “retrofit” heating system, the current works will be catastrophic, irreversible, and risk residents’ health, while costing Camden more initially and creating a long-term financial drain in terms of maintenance and remedial work.

    The current submitted proposals fail to insulate roofs or walls, add renewable energy, provide ventilation, or carry out thermal and overheating assessments. Camden also assumes new glazing can be installed in unmaintained existing frames with no site survey. This careless attitude is likely to be impractical and unaffordable once the extent of works is known. As the existing roof pipework is being left in place, the additional new pipework added to the existing will make it impossible to insulate the roof properly in the future, and solar energy will never be able to be added to the roof. Over 80% of households on Alexandra Road are Camden tenants, who will be left with permanently high heating bills and no ability to adapt, while elsewhere private homeowners benefit from subsidies for upgrades.

    The residents’ alternative, backed by experts Andy Ford (former CIBSE President) and Prof Aaron Gillich, Professor of Building Performance and Policy, is to immediately carry out proper analysis with full thermal modelling, cold-bridging assessment, and overheating assessments to inform:

    • Addition of roof and wall insulation (rear of Block A and roofs)

    • Provision of solar PV on all roofs — lowering residents’ bills

    • Inclusion of mechanical heat-recovery ventilation where possible — removing the causes of condensation, damp, and mould

    The residents’ proposal is fundamental to move the homes toward EPC C, the requirement for social housing by 2030.

    I therefore ask: will you intervene and cease all current design and procurement until a fully modelled, comprehensive retrofit, including renewable energy and insulation, is developed?

    Next year’s elections will be an important moment of accountability. If these concerns are not addressed, I will reflect on Camden’s response when casting my vote.